Shellcove Marina Breakwall Gates
These access gates were installed near the breakwalls to enable authorities to close access to the walking paths along the breakwalls during poor or unsafe weather conditions.
Client
Coastwide Civil
Project name
Shellcove Marina
Completion date
2022
BRIEF
Heavy duty aluminium gates to provide community safety.
The custom made 250x10mm CHS hinging posts were fabricated from 5083 aluminium and include an internal self lubricating nylon bush to provide a smooth maintenance free operation.
The light green highlights on the gates were applied to a high quality finish by skilled tradesmen.
A high quality product in a highly corrosive environment that will provide a low maintenance solution to provide community awareness and safety during poor weather conditions
Projects
Shellcove Precinct H Fencing
Fabrication and installation of a barrier to compliment surrounding distinctive architectural detailing.
The Shellharbour Club
The new outdoor terrace features approximately 10 tonnes of architecturally exposed structural steel.